Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Back, W E and Bell, L C (1995) Quantifying Process Benefits of Electronic Data Management Technologies. Journal of Construction Engineering and Management, 121(04), 415–21.

Barras, G C and Mayo, R E (1995) Minidirectional Drilling for Installation of Underground Electrical Conduit. Journal of Construction Engineering and Management, 121(04), 364–9.

Beliveau, Y J, Williams, J M, King, M G and Niles, A R (1995) Real-Time Position Measurement Integrated with CAD: Technologies and Their Protocols. Journal of Construction Engineering and Management, 121(04), 346–54.

Dias, A and Ioannou, P G (1995) Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects. Journal of Construction Engineering and Management, 121(04), 404–14.

Diekmann, J E and Girard, M J (1995) Are Contract Disputes Predictable?. Journal of Construction Engineering and Management, 121(04), 355–63.

Elzarka, H M and Bell, L C (1995) Object-Oriented Methodology for Materials-Management Systems. Journal of Construction Engineering and Management, 121(04), 438–45.

Hanlon, E J and Sanvido, V E (1995) Constructability Information Classification Scheme. Journal of Construction Engineering and Management, 121(04), 337–45.

Herbsman, Z J (1995) A+B Bidding Method—Hidden Success Story for Highway Construction. Journal of Construction Engineering and Management, 121(04), 430–7.

Hinze, J, Bren, D C and Piepho, N (1995) Experience Modification Rating As Measure of Safety Performance. Journal of Construction Engineering and Management, 121(04), 455–8.

Jeljeli, M N and Russell, J S (1995) Coping with Uncertainty in Environmental Construction: Decision-Analysis Approach. Journal of Construction Engineering and Management, 121(04), 370–80.

Kangari, R (1995) Risk Management Perceptions and Trends of U.S. Construction. Journal of Construction Engineering and Management, 121(04), 422–9.

Kim, J and Ibbs, C W (1995) Work-Package–Process Model for Piping Construction. Journal of Construction Engineering and Management, 121(04), 381–7.

Liu, L, Burns, S A and Feng, C (1995) Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method. Journal of Construction Engineering and Management, 121(04), 446–54.

Riley, D R and Sanvido, V E (1995) Patterns of Construction-Space Use in Multistory Buildings. Journal of Construction Engineering and Management, 121(04), 464–73.

Senior, B A (1995) Late-Time Computation for Task Chains Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 397–403.

Smith, S D, Osborne, J R and Forde, M C (1995) Analysis of Earth-Moving Systems Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 388–96.

Thomas, H R, Smith, G R and Cummings, D J (1995) Enforcement of Liquidated Damages. Journal of Construction Engineering and Management, 121(04), 459–63.